Recommendations
Wet receivers should be installed downstream of the moisture separator and before other purification equipment. Dry receivers are installed after purification equipment. All air receivers should be on blocks or some other small foundation to keep them dry and rust-free. There also should be enough space left around the receiver to allow for easy draining.
Specifications
Main body diameter: 1200mm
Capacity:720 Gallons
Code design : ASME VIII Div 1 Edition 2010